CSLB #580756Licensed & Insured
925-233-0109Mon–Fri 8–5 · Lafayette, CA
ADU Construction · Lafayette, CA · CSLB #580756

ADU Construction in Lafayette, CA — Every Type, Every Site Condition

An accessory dwelling unit (ADU) is a complete, self-contained second home on the same lot as your primary residence — its own kitchen, bathroom, and entrance. Nearly every residential lot in Lafayette can add one, and many can add more than one. We assess your site, pull the Contra Costa County permits, and build it — detached, garage conversion, or JADU — with one 30-person in-house crew under a single contract.

Since 1989
37 Years Building
30
In-House Crew
1
Contract & Team
CSLB 580756
Bonded & Insured
What It Involves

What Full-Scope ADU Construction in Lafayette Actually Involves

Building a complete, permitted second dwelling unit on your existing lot — detached, attached, garage conversion, or a junior ADU carved out inside your home. Under California law, every Lafayette property is guaranteed at least one ADU of up to 800 square feet, and detached units are commonly approved up to 1,200 square feet where the site and local standards allow.

An ADU is a self-contained living space with its own entrance, kitchen, and bathroom. In Lafayette, every ADU runs through the Contra Costa County building department, and the 2026 state rules are the most homeowner-friendly they have ever been: a 16-foot height baseline for detached units (18 feet near major transit), 4-foot side and rear setbacks, a 60-day approval clock on complete applications, and no impact fees on units 750 square feet or smaller.

1 Site Evaluation2 Design Coordination3 Permit Package4 Construction
A modern two-story residential home with clean architectural lines sits on a sloping hillside during dusk, featuring illuminated large windows, a wooden deck with metal railings, and a cantilevered upper level. The property showcases a manicured green lawn in the foreground, surrounding landscaping with native plants and stone features, and is nestled among mature trees with hills visible in the background. Warm interior and exterior lighting highlights the contemporary design as the sky displays soft pink and purple sunset hues.
37 Years on These Lots

Lafayette ADU Construction, Built From Home Base

Rhino Builders has built in Contra Costa County for 37 years — and Lafayette is home base, two miles from most central neighborhoods.

From the Ground Up

Every Lafayette ADU starts with a site assessment — before a floor plan is drawn or a permit is filed.

I’m Shay Zilber, CEO of Rhino Builders, and I’ve led Bay Area construction for over 20 years. The most expensive problems in ADU construction are the ones discovered after the design phase.

A homeowner in Burton Valley had confirmed zoning approval and picked a floor plan before we walked the backyard together. The first pass revealed a three-foot grade change, a drainage path through the only viable placement zone, and a High Fire Hazard Severity Zone designation that changed the material spec entirely.

We assess slope, soil, utilities, and fire zone before any design begins — so the permit package is built around the lot that exists. That’s how a project reaches Certificate of Occupancy without revision cycles.

Shay Zilber
CEO, Rhino Builders · 20+ years leading Bay Area construction

A man wearing a dark navy t-shirt with "RHINO BUILDERS" branding stands with his arms crossed inside an unfinished wooden-framed house under construction. He is positioned in a hallway or interior space with exposed wooden studs, framing, and windows visible in the background, appearing confident and professional in the construction setting.
No Budget Surprises

All Documented Costs Confirmed Before Your Contract Is Signed

Site prep — grading, drainage, retaining walls, utility connections — can shift an ADU budget significantly. Before a contract is signed, we document each site-specific input as its own line item.

A modern kitchen featuring natural wood cabinetry in warm oak tones paired with a white ribbed island, light stone countertops, and brass and leather bar stools. The space includes pendant lighting, stainless steel appliances, and opens to an outdoor terrace visible through large black-framed glass doors, creating a bright, contemporary design with warm and neutral color palette.

A permit package with missing documentation draws a correction letter from the building department. Documenting everything correctly on the first submission avoids that entirely — full detail on our Lafayette Building Permits resource page.

Assessment to Occupancy

How We Move an ADU From First Walk to Move-In

Every Lafayette ADU runs through the same five phases, under one license and one contract.

01

Lot Conditions First

Slope, soil, fire zone, and utility stubs are recorded before design begins.

02

Lot-Specific Floor Plan

Studio, one-bed, or two-bed — based on what your setback envelope and coverage allow.

03

Complete Permit Package

Drawings, engineering, Title 24, and site docs built to clear plan check on the first round — the City must approve or deny a complete application within 60 days.

04

Single-Team Construction

Our 30-person crew handles every trade — nothing handed to the homeowner.

05

Inspections to C of O

We manage every inspection through to certificate of occupancy.

A modern luxury bathroom features a dark slate accent wall with two large gold-framed mirrors and brass wall-mounted faucets above a white marble trough sink. To the right, a spacious walk-in shower with glass enclosure and brass fixtures is complemented by white subway tile walls and a rainfall showerhead. The space is accented throughout with brass hardware, pendant lighting, and white towels, creating an elegant contrast between the dark and light design elements.
One Sequence, One Team

Permits, Engineering & Construction Managed as a Single Process

The permit process in Lafayette runs through Contra Costa County — with specific requirements general ADU guidance doesn’t cover. We’ve filed here for decades.

37 Years in the Field

Permitted ADU builds across Contra Costa County — assessed on the ground, approved on the first submission.

Every Type, Every Lot

Types of ADU Construction We Complete Across Lafayette

Each ADU type follows a different structural and permitting path — the right choice depends on your lot and goals. Most Lafayette single-family lots can combine more than one, commonly a standard ADU plus a JADU inside the main home. For multi-unit properties or an SB 9 lot split, see our multi-family ADU construction page.

A freestanding unit fully separate from the main home — up to 1,200 sq ft where the site allows, and the strongest option for rental income and resale.

Up to 500 sq ft created inside your existing home — the lowest-cost path, and as of 2026 no owner-occupancy requirement when it has its own bathroom.

Converting an existing garage into permitted living space — fire separation, ceiling height, and panel upgrades assessed first. Often the fastest, lowest-cost ADU.

LafayetteReliez ValleyBurton ValleyHappy ValleyOrindaMoragaWalnut CreekPleasant HillOaklandContra Costa County

Ready to Talk About Your ADU?

The first step is a conversation about your lot — not a commitment. Tell us where it is, whether you’re thinking attached, detached, or garage conversion, and what you know about the site.

3685 Mount Diablo Blvd #161, Lafayette, CA 94549

Good to Know

Questions Lafayette Homeowners Ask About ADU Construction

Most Lafayette ADU projects run 12–18 months from first site assessment through certificate of occupancy — covering assessment, design, permit review through Contra Costa County (typically 4–8 weeks for a complete first-round submission), and construction.

Slope grade, soil bearing, utility stub locations, and your parcel’s Fire Hazard Severity Zone — all assessed before any floor plan is drawn.

Rhino Builders prepares and files the complete permit package with the Contra Costa County Building Department. Homeowners don’t manage submissions, corrections, or inspections.

Lot slope and utility-connection complexity are the biggest site-driven variables; unit size and finish level are the largest design-driven ones — all documented as line items before the contract.

Yes — the slope determines what engineering is required first: typically a geotechnical report, grading plan, and retaining-wall engineering, all identified during the site assessment.

A detached ADU is freestanding; an attached ADU shares a wall and is structurally integrated. They differ in foundation and utility routing, but both go through the same Contra Costa County permit process.

Most single-family lots can add more than one unit — commonly one standard ADU plus one JADU, and in many cases an additional conversion unit. There is no minimum lot size for the state-guaranteed 800-square-foot ADU; slope, setbacks, and utility access matter more than raw lot size. We confirm the exact combination during your site assessment.

No. Only the new ADU is assessed and added to your tax bill — your main home’s existing assessed value is protected under Proposition 13. You’re taxed on the value the ADU adds, not on a reassessment of the entire property.